Below is a summary of the contents of the second volume of the A830 Arisaig to Loch nan Uamh Improvement. To open the pdf files please click on the links under the Current Documents section.
FIGURES
1.1 General Location Plan
1.2 Proposed Route
1.3 Proposed Route within the cSAC
4.1 Environmental Constraints
5.1 Route Options Considered
6.1 Middle On-Line Route, Chainage 10+932 to 11+630
6.2 Middle On-Line Route, Chainage 11+631 to 12+600
6.3 Middle On-Line Route, Chainage 12+600 to 13+360
6.4 Middle On-Line Route, Chainage 13+360 to 14+275
6.5 Middle On-Line Route, Chainage 14+275 to 15+200
6.6 Middle On-Line Route, Chainage 15+200 to 16+075
6.7 Middle On-Line Route, Chainage 16+075 to 16+880
6.8 Middle On-Line Route, Chainage 16+880 to 17+715
6.9 Middle On-Line Route, Chainage 17+715 to 18+600
[Back to Top]
9.1 Land Use
9.2 Land Capability for Agriculture
9.3 Land Capability for Forestry
9.4 Quality Plantation
10.1 Solid Geology
10.2 Superficial Materials (Drift)
10.3 Hydrology
10.4 Soils
11.1 Watercourses
11.2 Proposed Drainage
11.3 Proposed Drainage
12.1 Habitat Survey
12.2 Habitat Survey
12.3 Woodland Map 1876
12.4 Woodland Map 1902
12.5 Habitat Survey in the cSAC
[Back to Top]
13.1 Topography
13.2 Landscape Character
13.3 Visual Envelope: During Construction
13.4 Visual Envelope: After Construction (15 years)
13.5 Visual Envelope: Do Nothing
13.6 Visual Effects on Properties and Outdoor Sites
14.1 Cultural Heritage
14.2 Trees at Larachmore Gardens (North Boundary)
14.3 Trees at Larachmore Gardens (Northeast Boundary)
14.4 Artists Impression (Larachmore Bridge: Before and After Construction)
15.1 Pedestrians, Cyclists and Community Effects
17.1 Local Air Quality/ Traffic Noise and Vibration
20.1 Policies and Plans
[Back to Top]
23.1 Landscape Proposals, Chainage 10+932 to 11+630
23.2 Landscape Proposals, Chainage 11+631 to 12+600
23.3 Landscape Proposals, Chainage 12+600 to 13+360
23.4 Landscape Proposals, Chainage 13+360 to 14+275
23.5 Landscape Proposals, Chainage 14+275 to 15+200
23.6 Landscape Proposals, Chainage 15+200 to 16+075
23.7 Landscape Proposals, Chainage 16+075 to 16+880
23.8 Landscape Proposals, Chainage 16+880 to 17+715
23.9 Landscape Proposals, Chainage 17+715 to 18+600
23.10 Landscape Proposals - Section Through the Proposed Route
23.11 Landscape Proposals - Section Through the Proposed Route
23.12 Landscape Proposals - Section Through the Proposed Route
23.13 Landscape Proposals - Section Through the Proposed Route
23.14 Landscape Proposals - Section Through the Proposed Route
[Back to Top]