Pending works schedules

Pending works schedule August 2024 S18

Scheduled watercourse maintenance works - pending

Works number

Watercourse name

Location

Date for re-inspection*

Description of works

580

South Kessock Seawall

3 Areas in the seawall

25/02/2025

Repair missing stones sets in the seawall

608

Dingwall Flood Defences

Canal footpath At victoria park

10/10/2024

Infill and seal holes in the embankment where rabbits have been burrowing.

626

Mill Burn

Culvert under Sir Walter Scott Drive

10/09/2024

Remove all silt and stone deposation from the inlet and ditch 10m upstream from the inlet

628

Druid Temple Burn

Druid Temple Crescent, Inverness

10/09/2024

Remove all silt and stone deposation from the inlet and ditch 10m upstream from the inlet

633

Druid Temple Burn

Next to the playing ground at Grebe Avenue Hall

10/09/2024

Remove all vegetation lying in and across the burn which is restricting forward flow of water

635

Ault na Skiah

Adjacent to the Distributor Road (B8082) behind properties on Castle Heather Avenue

10/09/2024

remove silt accumulations from the culvert inlet which has reduced the culvert width by approx 50%, please remove any self seeded trees that are growing in the burn or on the burn sides.

636

SWFRC

SWRFC numerous locations

10/09/2024

Remove all vegetation gorse/whin are growing on the crown and sides of the flood relief channel. Currently growing is numerous areas

641

Eil Burn

Behind Burnside Lane

31/10/2024

Remove vegetation along ditch. Priority increased following updated observation of increased weed growth.

658

Slackbuie Channel

Junction of Culduthel Road and Green Drive

10/09/2024

Silt accumulations and a build up of debris/rubbish at the culvert,some of which is lying at the twin culvert inlets, please remove as much silt as possible and ensure inlets are clear.

663

Beechwood Burn

Opposite the Veterinary Centre on the B9006 Culloden Road

10/09/2024

The outlet of structure 60 is suffering silt and vegetation deposition approx 90% surchaged, the inlet of structure 70 has similar issues although not surcharging, deposition is deflecting waterflows towards the sidewall, ditch burn 10 metres downstream from the outlet and 10m upstream from the inlet to return burn to original invert levels.

664

Ault na Skiah

Culvert outlet opposite Evan Barron Rd

10/09/2024

The culvert outlet is 50% surcharged due to windblown trees and woody debris lying across the watercourse for the majority of the open section down to the boundary fence of the property. Clear all woody debris from the open section.

690

Ben View Burn

Near Passing Place Lay-by next to Brahan View, Upper Arcan Road Marybank.

04/11/2024

Heavy Vegetation surrounding Inlet & all along Bank Upstream to Structure 60 & Downstream to S72. Vegetation to be cut back 10m Upstream from Inlet of S70 & all along Downstream between S70 & S72.

710

Hill Terrace Burn

Hill Terrace, Kinlochleven

15/08/2024

Silt/ Stone build up near Inlet. Should be removed to ensure unrestricted flow.

714

Slackbuie Spring

Upper Slackbuie along SWFRC, Inverness.

04/09/2024

Vegetation on spill to be cut down to geo fabric underneath.

719

Mill Burn

Sluice Gate near Millburn Court, Inverness

10/09/2024

RHS of Sluice blocked with Debris, forcing all Waterflow into LHS should be cleared.

724

Knockbain Burn

Knockbain Burn, near Gorstan, Dingwall

02/09/2024

Build up of Silt on LHS near Screen - Should be cleared

728

Balantoul Burn

Debris Screen near SSE Garage, A82 Fort Augustus.

22/08/2024

Screen Blocked & Surcharged 50% from Large Debris & Leaves. Rest of Screen to be cleared with large Debris removed. Side-cast Debris to removed also.

730

Ardival Burn

Rear entrance to Wyvis Hotel, Strathpeffer

02/09/2024

Old Stone Culvert has collasped, causing Inlet to Pool/ Surcharge & overtop over Road. Culvert to be replaced with new Pipe & Headwall.

732

Olrig Cemetery Burn

Olrig Cemetery, road leading to St Trothan's Church, Castletown

26/08/2024

Dual Stone Culvert/ Cundy has collapsed in middle of Culverted section parallel to Road. Multiple piles of side-cast Debris surrounding Screened Inlet U/S. Repair/ replace collapsed section, collect side-cast Debris near Screen.

738

Holm Burn

Underneath Bridge on B862, near Holm Lodge. Inverness

10/09/2024

Tree Limb stuck underneath Bridge on B862. Limb will need to be removed.

739

Swordale Burn

Bonar Bridge

15/10/2024

Stone/ Concrete Culvert Pipe has collasped causing Water to back up and overflow down towards the Property. Homeowners property, it is the responsibility of the Homeowner to undergo the Works required.

741

Park Burn

Park Road,Sstrathpeffer

07/11/2024

Partial blockage and likely collapse of stone culvert within 2m of Manhole. Section is estimated to be below footpath. Callapse to be repaired and blockage removed.

743

Guisach Burn

Treasures of the Earth Museum

28/08/2024

Screen blinded by sediment. BEAR contacted to clear the screen.

744

Mill Burn

Section between Mason Road & Teal Avenue

10/09/2024

Fallen Trees lying within the Watercourse accumulating Derbis. Trees & Debris to be removed to ensure un-restricted flow.

746

Smithton Burn

Trash screen upstream of railway bridge behind Murray Terrace, Smithton

11/09/2024

RHS of Screen blocked with washed down Debris, Silt, Stones etc. Should be removed to ensure un-restricted flow.

747

Clyne Burn

Along section of Burn that runs parallel with Clynelish Road & the back of Brora Distillery

19/09/2024

Fallen Tree lying within the Watercourse accumulating Derbis upstream from Culvert Inlet, Tree & Debris to be removed to ensure un-restricted flow.

748

Gergask Burn

Culvert under single track road near Am Bothan,

Laggan

15/01/2025

Culvert Inlet blocked with Wooden debris & Large Tree Branch, should be removed to ensure un-restricted flow

749

Eil Burn

Screened Inlet to Culvert under Station Road (A862), Conon Bridge

31/10/2024

Inlet area silted up which has raised the bed of the watercourse, silting the Screen Inlet by approx. 50%. Silt should be removed surrounding the Inlet.

751

Culloden Burn West

Outlet of Culvert, next to Gruffalo carving

12/03/2025

Burn blocked with cluster of Woody debris, should be cleared to ensure un-restricted flow

752

Beechwood Burn

Outlet of Culvert that runs parallel with A9 Ditch

10/12/2024

Outlet of Culvert blocked with Stones. The Stones should be removed from the Outlet and the Watercourse should be ditched down to original bed levels up to 10m downstream from the Outlet.

* The stated date for re-inspection denotes when the re-inspection is due and not when the works are due to be carried out