Pending works schedule August 2024 S18
|
Works number |
Watercourse name |
Location |
Date for re-inspection* |
Description of works |
|---|---|---|---|---|
|
580 |
South Kessock Seawall |
3 Areas in the seawall |
25/02/2025 |
Repair missing stones sets in the seawall |
|
608 |
Dingwall Flood Defences |
Canal footpath At victoria park |
10/10/2024 |
Infill and seal holes in the embankment where rabbits have been burrowing. |
|
626 |
Mill Burn |
Culvert under Sir Walter Scott Drive |
10/09/2024 |
Remove all silt and stone deposation from the inlet and ditch 10m upstream from the inlet |
|
628 |
Druid Temple Burn |
Druid Temple Crescent, Inverness |
10/09/2024 |
Remove all silt and stone deposation from the inlet and ditch 10m upstream from the inlet |
|
633 |
Druid Temple Burn |
Next to the playing ground at Grebe Avenue Hall |
10/09/2024 |
Remove all vegetation lying in and across the burn which is restricting forward flow of water |
|
635 |
Ault na Skiah |
Adjacent to the Distributor Road (B8082) behind properties on Castle Heather Avenue |
10/09/2024 |
remove silt accumulations from the culvert inlet which has reduced the culvert width by approx 50%, please remove any self seeded trees that are growing in the burn or on the burn sides. |
|
636 |
SWFRC |
SWRFC numerous locations |
10/09/2024 |
Remove all vegetation gorse/whin are growing on the crown and sides of the flood relief channel. Currently growing is numerous areas |
|
641 |
Eil Burn |
Behind Burnside Lane |
31/10/2024 |
Remove vegetation along ditch. Priority increased following updated observation of increased weed growth. |
|
658 |
Slackbuie Channel |
Junction of Culduthel Road and Green Drive |
10/09/2024 |
Silt accumulations and a build up of debris/rubbish at the culvert,some of which is lying at the twin culvert inlets, please remove as much silt as possible and ensure inlets are clear. |
|
663 |
Beechwood Burn |
Opposite the Veterinary Centre on the B9006 Culloden Road |
10/09/2024 |
The outlet of structure 60 is suffering silt and vegetation deposition approx 90% surchaged, the inlet of structure 70 has similar issues although not surcharging, deposition is deflecting waterflows towards the sidewall, ditch burn 10 metres downstream from the outlet and 10m upstream from the inlet to return burn to original invert levels. |
|
664 |
Ault na Skiah |
Culvert outlet opposite Evan Barron Rd |
10/09/2024 |
The culvert outlet is 50% surcharged due to windblown trees and woody debris lying across the watercourse for the majority of the open section down to the boundary fence of the property. Clear all woody debris from the open section. |
|
690 |
Ben View Burn |
Near Passing Place Lay-by next to Brahan View, Upper Arcan Road Marybank. |
04/11/2024 |
Heavy Vegetation surrounding Inlet & all along Bank Upstream to Structure 60 & Downstream to S72. Vegetation to be cut back 10m Upstream from Inlet of S70 & all along Downstream between S70 & S72. |
|
710 |
Hill Terrace Burn |
Hill Terrace, Kinlochleven |
15/08/2024 |
Silt/ Stone build up near Inlet. Should be removed to ensure unrestricted flow. |
|
714 |
Slackbuie Spring |
Upper Slackbuie along SWFRC, Inverness. |
04/09/2024 |
Vegetation on spill to be cut down to geo fabric underneath. |
|
719 |
Mill Burn |
Sluice Gate near Millburn Court, Inverness |
10/09/2024 |
RHS of Sluice blocked with Debris, forcing all Waterflow into LHS should be cleared. |
|
724 |
Knockbain Burn |
Knockbain Burn, near Gorstan, Dingwall |
02/09/2024 |
Build up of Silt on LHS near Screen - Should be cleared |
|
728 |
Balantoul Burn |
Debris Screen near SSE Garage, A82 Fort Augustus. |
22/08/2024 |
Screen Blocked & Surcharged 50% from Large Debris & Leaves. Rest of Screen to be cleared with large Debris removed. Side-cast Debris to removed also. |
|
730 |
Ardival Burn |
Rear entrance to Wyvis Hotel, Strathpeffer |
02/09/2024 |
Old Stone Culvert has collasped, causing Inlet to Pool/ Surcharge & overtop over Road. Culvert to be replaced with new Pipe & Headwall. |
|
732 |
Olrig Cemetery Burn |
Olrig Cemetery, road leading to St Trothan's Church, Castletown |
26/08/2024 |
Dual Stone Culvert/ Cundy has collapsed in middle of Culverted section parallel to Road. Multiple piles of side-cast Debris surrounding Screened Inlet U/S. Repair/ replace collapsed section, collect side-cast Debris near Screen. |
|
738 |
Holm Burn |
Underneath Bridge on B862, near Holm Lodge. Inverness |
10/09/2024 |
Tree Limb stuck underneath Bridge on B862. Limb will need to be removed. |
|
739 |
Swordale Burn |
Bonar Bridge |
15/10/2024 |
Stone/ Concrete Culvert Pipe has collasped causing Water to back up and overflow down towards the Property. Homeowners property, it is the responsibility of the Homeowner to undergo the Works required. |
|
741 |
Park Burn |
Park Road,Sstrathpeffer |
07/11/2024 |
Partial blockage and likely collapse of stone culvert within 2m of Manhole. Section is estimated to be below footpath. Callapse to be repaired and blockage removed. |
|
743 |
Guisach Burn |
Treasures of the Earth Museum |
28/08/2024 |
Screen blinded by sediment. BEAR contacted to clear the screen. |
|
744 |
Mill Burn |
Section between Mason Road & Teal Avenue |
10/09/2024 |
Fallen Trees lying within the Watercourse accumulating Derbis. Trees & Debris to be removed to ensure un-restricted flow. |
|
746 |
Smithton Burn |
Trash screen upstream of railway bridge behind Murray Terrace, Smithton |
11/09/2024 |
RHS of Screen blocked with washed down Debris, Silt, Stones etc. Should be removed to ensure un-restricted flow. |
|
747 |
Clyne Burn |
Along section of Burn that runs parallel with Clynelish Road & the back of Brora Distillery |
19/09/2024 |
Fallen Tree lying within the Watercourse accumulating Derbis upstream from Culvert Inlet, Tree & Debris to be removed to ensure un-restricted flow. |
|
748 |
Gergask Burn |
Culvert under single track road near Am Bothan, Laggan |
15/01/2025 |
Culvert Inlet blocked with Wooden debris & Large Tree Branch, should be removed to ensure un-restricted flow |
|
749 |
Eil Burn |
Screened Inlet to Culvert under Station Road (A862), Conon Bridge |
31/10/2024 |
Inlet area silted up which has raised the bed of the watercourse, silting the Screen Inlet by approx. 50%. Silt should be removed surrounding the Inlet. |
|
751 |
Culloden Burn West |
Outlet of Culvert, next to Gruffalo carving |
12/03/2025 |
Burn blocked with cluster of Woody debris, should be cleared to ensure un-restricted flow |
|
752 |
Beechwood Burn |
Outlet of Culvert that runs parallel with A9 Ditch |
10/12/2024 |
Outlet of Culvert blocked with Stones. The Stones should be removed from the Outlet and the Watercourse should be ditched down to original bed levels up to 10m downstream from the Outlet. |
* The stated date for re-inspection denotes when the re-inspection is due and not when the works are due to be carried out